Courses / Departmental project 3

Course data
Code: BMEEPIPT711
Course requirements: Design Global Basic, Departmental Project 1
Final requirements: Participation in 70% of the lessons is set as a condition. Only the active practice counts for presence.
Credits:
Time: 8 hours practice
Coursemaster: Bartók István DLA
Instructors: Bartók István DLA
Árva József DLA
Description: DEPARTMENTAL PROJECT 3 FALL 2019
DEPARTMENT FOR INDUSTRIAL AND AGRICULTURAL BUILDING DESIGN

BUDAPEST 7 and 8 – EMPLOYMENT CENTRE – STUDYING SPACES 2.0
COURSE DESCRIPTION


The project site for the Departmental Project 3 of the autumn semester of 2019 is the 7th and 8th district of Budapest. We are researching possibilities of schools and studying spaces. The task is to design a so-called Employment Centre; a moderately complex, multifunctional, eco- and energy-conscious building, a special educational institution for disadvantageous young people completed with spaces of common use.
Each unit can be different due to the design programs made up by the students fitting the needs of different target groups. To understand the existing complex situation, to analyse the urban context are the most important part of this semester work. The overall useful area of the buildings to be designed is about 800 m2. The semester starts with the presentation of the programs and a site visit.

CONTENT AND FORMAL REQUIREMENTS

Concept design (projected presentation):
- layout 1:1000 (with site analysis)
- presentation of building(s) of similar character as reference (3-4 A4 pages)
- elaboration of the design program, presentation of function
- scale-model, presentation of the basic design ideas (master plan, scheme function min. 1:500)

Preliminary design I. (projected presentation):
This design phase is already individual work, focusing on the development of the architectural form, of the relation between space and mass, of the relation with the surrounding, and of the interior functional system.
- site plan M=1:500, 1000
- plans of the different levels, sections, elevations M=1:200
- perspective views, sketches, scale-model with surroundings

Preliminary design II.:
The same as Preliminary design I., but only in case of unsuccessful presentation, or upon request.

Final project (projected presentation):
At the end of the semester detailed 1:100 documentation has to be prepared.
(simplified „program design”):
- site plan at a scale of M=1:200, 500 with surroundings (buildings, garden, streets, walking ways, entrances, delivery entrances, flooring)
- plans of all different levels with the name of the rooms marked 1:100 (exceptional case 1:200)
- at least 2 different sections showing the structural solutions, dimensions 1:100 (exceptional case 1:200)
- all facades with the used materials and 1:100 (exceptional case 1:200)
- perspective view with the surrounding, street view, photomontage
- technical description (main ideas, functional system, used materials) cca. 1 A4 page
- Model min. scale M= 1:333 (paper, balsa wood, plexi)

Formal requirements:
All drawings can be traditional hand- or CAD drawings or any other optional official scaled printed technique. Size, format, legend due to sample sheet given by the department. Beside the detailed documentation a compressed sheet of 59.4 x 178.2 cm of the project must be submitted as well. Submission is fulfilled with e-mail delivery, presentation is highly recommended, but not compulsory! The clear and correct technical presentation is important. A stable cover due to the plans dimensions with index is necessary. Models have to be submitted in boxes. The name and e-mail address of the author and the title of the project have to be marked on each plan, cover, model and box.


September 2019.


Nagy Iván DLA            Bartók István DLA       Vasáros Zsolt DLA
associate professor     associate professor     associate professor
head of course            head of course            head of department


Schedule:
1.9th September 2019. Monday 10:15-14:00 K 393 Introductory lecture, registration 
12th September 2019. Thursday 10:15-14:00 K 393 Day off – BME sports day 
2.16th September 2019. Monday 10:15-14:00 K 393 Site visit, design study-research, studio work 
19th September 2019. Thursday 10:15-14:00 K 393 Building visit, study-research, studio work 
3.23rd September 2019. Monday 10:15-14:00 K 393 Elaboration of concept design, studio work 
26th September 2019. Thursday 10:15-14:00  Elaboration of concept design, studio work 
4.30th September 2019. Monday 10:15-14:00 K 393 Presentation of layout - concept design and complex study, evaluation 
3rd October 2019. Thursday 10:15-14:00 K 393 Elaboration of concept design, studio work 
5.7th October 2019. Monday 10:15-14:00 K 393 1. additional presentation of concept design (only for students, who did not pass the first presentation) 
10th October 2019. Thursday 10:15-14:00 K 393 Elaboration of preliminary design, studio work 
6.14th October 2019. Monday 10:15-14:00 K 393 Elaboration of preliminary design, studio work 
17th October 2019. Thursday 10:15-14:00, 15th October 2016. Saturday 10:15-14:00 K 393 Elaboration of preliminary design, studio work 
7.21st October 2019. Monday 10:15-14:00 K 393 Preliminary studio week 
24th October 2019. Thursday 10:15-14:00 K 393 Preliminary studio week 
8.28th October 2019. Monday 10:15-14:00  Presentation of preliminary design, evaluation 
31st October 2019. Thursday 10:15-14:00 K 393 Elaboration of final design, studio work 
9.4th November 2019. Monday 10:15-14:00 K 393 Elaboration of final design, studio work 
7th November 2019. Thursday 10:15-14:00  2. additional mid-term presentation of preliminary design (only for students, who did not pass the first presentation) 
10.11th November 2019. Monday 10:15-14:00 K 393 Elaboration of final design, studio work 
14th November 2019. Thursday 10:15-14:00 K 393 Elaboration of final design, studio work 
11.18th November 2019. Monday 10:15-14:00 K 393 Elaboration of final design, studio work 
21st November 2019. Thursday 10:15-14:00 K 393 Elaboration of final design, studio work 
12.25th November 2019. Monday 10:15-14:00 K 393 Elaboration of final design, studio work 
28th November 2019. Thursday 10:15-14:00 K 393 Elaboration of final design, studio work 
13.2th December 2019. Monday 10:15-14:00 K 393 Elaboration of final design, studio work 
5th December 2019. Thursday 10:15-14:00 K 393 Elaboration of final design, studio work 
14.9-13th December 2019. Monday-Friday K 393 PROJECT FINALISATION WEEK 
   
15.13th December 2019. Friday 12:00 K 251 Project submission 
20th December 2019. Friday 12:00 K 251 Delayed submission (with late fee) 
Downloads
1 parking requirement.pdf (286 kB)parking requirement
2 lavatory requirement.pdf (40 kB)lavatory requirement
number of parking spaces.pdf (210 kB)
dembinszky_26.zip (11617 kB)
lujza_24.zip (7794 kB)
Nantes_LV_.zip (8173 kB)
Peterfy_34.zip (9699 kB)
szerdahelyi_14.zip (9706 kB)
VIII_height_dates.dwg (2400 kB)
VIII_height_dates.pln (12793 kB)
07_building_heights.pdf (1799 kB)
TT3_sheet_sample.psd (7354 kB)
dp3_course_description_2019.pdf (87 kB)
News
2019. 10. 27. 06:55
PRELIMINARY DESIGN PRESENTATION!

Dear DP3 Students,

due to the schedule on Monday, 28th October 10.15 am we meet in the classroom K 364 for presentation of the preliminary design. The digital presentation is compulsory! About the content see the course description.
2019. 09. 27. 18:16
CONCEPT DESIGN PRESENTATION - CLASSROOM CHANGE!

Dear DP3 Students,

due to the schedule on Monday, 30th September 10.15 am we meet in the classroom K 363 for presentation of the concept design. The digiotal presentation is compulsory! About the content see the course description.
See the site plans in scale of the plots Lujza street 24, Szerdahelyi street 14 enclosed.
2019. 09. 14. 17:42
Dear DP3 Students,

On Monday 16th September 10.15 am we meet in the classroom K 393 and visit the design sites together. Please, take cameras with you.

On Thursday 19th September we can visit an example reference building together with the students of the Hungarian course. The Professional School of the Piarist order in Göd with the architect János Golda. We meet Thursday exactly 9.00 am at the main entrance (stairs) of the K building of BME. We will return at about 1.00 pm.

2019. 01. 15. 19:19
Dear Dp 3 Students,
the final results. (The preliminary presentation counts as 35%, the final submission as 65% in the weighted average.)
2018. 12. 04. 17:12
Dear Dp3 Students,
see the grades of the preliminary presentation enclosed. The preliminary grades count 35% percent of the final grade.